Faced with costs of about $27,000 to strip and paint each T-38 aircraft and deal with the application and removal of hazardous waste, a cost/risk reduction approach was initiated in October 1997 in the corrosion control shop at Randolph Air Force Base. The approach yielded alternatives projected to reduce total shop costs by 5 to…