A large-scale single coal/oil fired power plant with total installed electrical generating capacity of 4,100 megawatts (MW) performed benchmark comparisons with 72 other power plants after downsizing and management change. Six steps were taken. 1. Identify the key maintenance variables to be compared. 2. Select appropriate information sources including hiring a consultant. 3. Collect and…

BPIR Categories

14.2.3 Benchmark performance measures against competitors
14.2.2 Benchmark performance measures with noncompetitors