In 2000, Aermacchi, an Italian designer and producer of trainers for military pilots, launched its M-346 fighter jet trainer project with a delivery goal of 2009. Design authority was established with an integrated product team (IPT) and it was assigned the responsibility of designing a performance measurement system (PMS) to evaluate the compliance with cost and time targets. The basic performance dimensions to be monitored were detailed into lower-level performance targets, specific indicators...

BPIR Categories

9.5.1 Develop performance management approach
3.2.1 Translate customer needs into product requirements
14.1.1 Design & deploy performance measurement system