The Ontario Ministry of Transportation (MTO), Canada conducted a VE study on the design of a $33 million freeway construction project. Using performance criteria and measures the VE team concluded that the original design would not operate successfully at the interface of local roads and the ramps. Thirty-two ideas were analysed and a new design…