The Ontario Ministry of Transportation (MTO), Canada conducted a VE study on the design of a $27 .7 Million bridge rehabilitation project. The VE team used traffic modelling to demonstrate that the proposed construction of a temporary detour bridge was unnecessary as bridge user impacts during construction would be bearable. 3 of 13 VE proposals were fully accepted at the cost of a period of reduction in user quality. The VE study resulted in savings of $1,349,900 (over 50% of the total project ...