In a project to reduce cofferdam and dewatering costs in 1994, the Rio Puerto Nuevo Wastewater Treatment Plant in the USA had a value engineering study performed. The study considered three alternative piping and construction methods: 1) directional drilling, which projected savings of $262,000; 2) the use of ductile iron "river joint" pipe which projected…