A measure of the speed at which work-in-process moves through a plant. Typically calculated by dividing the annual cost of goods sold (for the most recent full year) by the average on-hand WIP value at plant cost.

BPIR Categories

5.3.4 Make product
15.6.12 Manage buildings, equipment & materials

Unlock this article and 10,000+ more

To get the most out of our extensive resources, please login or become a member below.

OR
X
X