A measure of the maintenance cost that can be classed as value added. This can be for example, maintenance that improves the base-line performance of the system/process.

BPIR Categories

5.5.4 Schedule & perform maintenance
15.6.12 Manage buildings, equipment & materials

Unlock this article and 10,000+ more

To get the most out of our extensive resources, please login or become a member below.

OR
X
X